![Data Centre Banner](https://www.coldclad.com/wp-content/uploads/2022/11/Data-Centre-Banner.jpg)
A Company You Can Trust
Over the past decade, we have had the pleasure to work on numerous Data Centres across the UK. This vast experience has made us specialists in Data Centre Construction.
Our objective is simple: to design and install the best data centres in the industry – economically, within budget and on time.
Most importantly our work is fire rated, giving your team a safe environment and peace of mind.
Safety As A Priority
As industry pioneers, we have led the way in introducing and innovating newer, more cost-effective but equally safe fire-rated construction. We constantly work to find the safest materials and methods of installation to give our customers the best.
We have completed an impressive number of projects over the years, grown to meet demand and continue to be an authority in data centre and fire-rated construction.
From a straightforward installation to a complex large-scale project, Cold Clad promises an unrivalled level of excellence and commitment, reflected in our work throughout the years.
Projects
A selection of Data Centre construction projects
![](https://www.coldclad.com/wp-content/uploads/2022/11/DataCent-1-320-C.jpg)
Data Centre 2 - Slough
Ongoing complete new Data Centre constructed over 3 floors, works currently 98% complete…
![](https://www.coldclad.com/wp-content/uploads/2022/11/Data-Centre2-Slough-320-1.jpg)
Data Centre - Slough
Phase 1 circa 11,650m2 of 100mm wall panels and 150mm ceiling panels – 60FR & 90FR…
![](https://www.coldclad.com/wp-content/uploads/2022/11/Cyxtera-Menu-C.jpg)